SIEMAG Production Report · shift active
LIVE
13,290 short tons hoisted today
34% ahead of pace
909
skips today
92%
hoist availability
10
faults today
just now
last update · streaming from the PLC
Current Time: | Report Date: July 16, 2026
Siemag Tecberg

SIEMAG Production Report


July 16, 2026
Aweeba

Daily Production

34% ahead of pace vs target
Short Tons 13,289
110.75%
Skips 909
Hours 19:49:12

Record Day (Year)

Fiscal Year Date Tons
FY 2026 July 4, 2026 16,752
FY 2025 N/A 0

Record Week (Year)

Fiscal Year Week Ending Tons
FY 2026 July 5, 2026 112,325
FY 2025 N/A 0

Hoist Availability

Mode - Off 00:00:00
Mode - Skip Auto 23:59:51
Mode - Skip Manual 00:00:00
Waiting - Surge Bin Full 00:00:00
Waiting - Loading Pocket South 00:00:00
Waiting - Loading Pocket North 00:00:00
Hoist Faulted CAT1, CAT2 00:09:54
E-Stop 00:08:02
Mode - Inspect 00:00:00
Mode - Personnel 00:00:00
Mode - Rope Up 00:00:00
Mode - Heavy 00:00:00
Mode - Gravity 00:00:00
Mode - Brake Maintenance 00:00:00
Single Skip North Side 09:13:11
Single Skip South Side 05:05:57
Tipple Bin North High 00:00:00
Tipple Bin North Off 00:00:00
Tipple Bin South High 00:00:00
Tipple Bin South Off 00:00:00
Faults Summary
5 Faults
Code Description Category Occurrences Duration
205 Surge Bin Level High Position 5 00:04:59
194 Tight Rope South Loadcell Rope 2 00:02:00
212 Loading Pocket Not Ready Position 1 00:01:00
233 Skip Overload Load 1 00:00:58
112 South Drum Movement, Clutch Disengaged Rope 1 00:00:57

07/15/2026 | 1st Shift - 11:00 PM to 6:59 AM

Start End Skips North Skips South Skips Hour ST North Avg ST North ST South Avg ST South Total ST Avg Total ST Hourly Target | 500
23:00 00:00 23 22 45 336 14.63 318 14.52 655 14.57 131.0%
00:00 01:00 39 19 58 573 14.70 281 14.79 854 14.74 170.8%
01:00 02:00 29 20 49 417 14.42 297 14.91 715 14.62 143.0%
02:00 03:00 19 24 43 282 14.90 346 14.42 628 14.64 125.6%
03:00 04:00 19 10 29 275 14.51 144 14.55 421 14.52 84.2%
04:00 05:00 26 24 50 382 14.74 347 14.48 729 14.62 145.8%
05:00 06:00 30 23 53 438 14.65 332 14.47 771 14.57 154.2%
06:00 07:00 19 22 41 278 14.72 321 14.67 601 14.69 120.2%
Totals: 204 164 368 2,988 14.65 2,393 14.59 5,382 14.63 134.5%

07/16/2026 | 2nd Shift - 7:00 AM to 2:59 PM

Start End Skips North Skips South Skips Hour ST North Avg ST North ST South Avg ST South Total ST Avg Total ST Hourly Target | 500
07:00 08:00 25 28 53 363 14.55 418 14.99 782 14.78 156.4%
08:00 09:00 14 17 31 209 15.00 244 14.40 454 14.67 90.8%
09:00 10:00 20 29 49 288 14.47 426 14.73 715 14.62 143.0%
10:00 11:00 27 21 48 382 14.18 308 14.72 691 14.42 138.2%
11:00 12:00 24 23 47 343 14.33 331 14.44 675 14.39 135.0%
12:00 13:00 26 22 48 373 14.39 319 14.57 694 14.47 138.8%
13:00 14:00 35 15 50 512 14.66 213 14.27 726 14.55 145.2%
14:00 15:00 23 20 43 337 14.67 293 14.70 631 14.69 126.2%
Totals: 194 175 369 2,814 14.51 2,560 14.64 5,375 14.57 134.4%

07/16/2026 | 3rd Shift - 3:00 PM to 10:59 PM

Start End Skips North Skips South Skips Hour ST North Avg ST North ST South Avg ST South Total ST Avg Total ST Hourly Target | 500
15:00 16:00 23 20 43 330 14.43 292 14.64 623 14.53 124.6%
16:00 17:00 18 22 40 262 14.59 325 14.78 587 14.70 117.4%
17:00 18:00 22 29 51 324 14.74 431 14.89 755 14.83 151.0%
18:00 19:00 19 19 38 277 14.66 283 14.91 561 14.78 112.2%
19:00 20:00 0 0 0 0 0.00 0 0.00 0 0.00 0.0%
20:00 21:00 0 0 0 0 0.00 0 0.00 0 0.00 0.0%
21:00 22:00 0 0 0 0 0.00 0 0.00 0 0.00 0.0%
22:00 23:00 0 0 0 0 0.00 0 0.00 0 0.00 0.0%
Totals: 82 90 172 1,197 14.61 1,332 14.82 2,529 14.72 63.2%
1st Shift - MIDS

5,382 ST

2nd Shift - DAYS

5,375 ST

3rd Shift - AFTS

2,529 ST

Daily Production Progress
13,289 ST Target: 12,000.00 ST
110.75%
Exceeds target - excellent performance

Filter Faults

Default: Last 7 days
Leave empty for all faults

Top 10 Faults by Duration

Loading Top 10 faults...

All Faults

0 Faults
Code Mode Description Category Timestamp Duration

Faults by Occurrence

0 Faults

Loading faults by occurrence...


Shift Intelligence
July 16, 2026 Current Shift
Shift Summary

The shift produced 12056.14 tons across 909 skips, exceeding the 12000-ton daily target by 56.139999999999 tons (100% of goal). The team experienced 5 fault events (2 Position, 2 Rope, 1 Load) totaling 9.9 minutes of downtime and 9 E-stop events totaling 0 minutes.

Operational Impact
  • Fault code 205 (Surge Bin Level High) occurred 5 times - indicates systematic issue requiring maintenance attention
  • Exceeded daily goal by 56.139999999999 tons, contributing positively toward monthly target
  • 9.9 minutes of fault-related downtime reduced potential output by approximately 13 tons
  • Year-to-date production at 11% of annual target - sustained improvement needed to meet yearly goals
Priority Focus
  1. Investigate fault code 205 (Surge Bin Level High) - 5 occurrences indicates systematic issue requiring maintenance
  2. Multiple fault categories detected - conduct comprehensive system health check
  3. Investigate root causes of 9 E-stop events (significantly above normal threshold)
Quick View
Daily Target
100%
Top Fault
Code 205 (5x)
Fault Downtime
9.9 min
E-Stops
9 events
Operating Hours
19.8 hrs

Shift Performance Trends
Shift 1
↗️ 130%
Actual 4,883 tons
Pace 610.4 tons/hr
Projected 4,883 tons
Target 3,760 tons
Shift 2
↗️ 130%
Actual 4,877 tons
Pace 609.6 tons/hr
Projected 4,877 tons
Target 3,760 tons
Shift 3
↗️ 122%
Actual 2,295 tons
Pace 573.8 tons/hr
Projected 4,590 tons
Target 3,760 tons
s