The operation
You run the mine.
Accountable for every shift, every tonne, every target — to the people above you and the crews below.
The problem
You're managing yesterday's production.
Last night's tonnes. The 2 a.m. fault. The shift that slipped. By the time it reaches a spreadsheet, it's already too late to act.
The cost
Every blind hour is tonnes you can't get back.
Downtime hides. Targets slip quietly. Decisions wait on data that's already old — and production walks out the door.
The answer
Know it the instant it happens.
SIEMAG Production Reporting streams live from your hoist systems — already running in salt mines today, built on the controls you already trust.
Your network behind your firewall
Hoist / PLC
Windows 11 PCSQL Express + sync agent
Outbound only · TCP 51433
streamed live as data arrives
No inbound traffic
SIEMAG reporting powered by Aweeba
Reporting cloud
Live dashboardsany browser
Current Time:
|
Report Date:
June 1, 2026
LIVE
Updated just now · from the hoist PLC
Refreshed 0 times today
Previous Shift
Current Shift
Specific Date
SIEMAG Production Report
June 1, 2026
Daily Production
3% ahead of pace
vs target
MT
5,318
Skips
518
Hours
16:37:48
Record Day (Year)
Fiscal Year
Date
Tons
FY 2026
May 4, 2026
9,623
FY 2025
N/A
0
Record Week (Year)
Fiscal Year
Week Ending
Tons
FY 2026
May 24, 2026
55,506
FY 2025
N/A
0
Hoist Availability
Mode - Off
01:50:00
Mode - Skip Auto
20:59:59
Mode - Skip Manual
00:00:00
Waiting - Surge Bin Full
00:00:00
Waiting - Loading Pocket South
00:00:00
Waiting - Loading Pocket North
00:00:00
Hoist Faulted CAT1, CAT2
01:30:00
E-Stop
00:20:00
Mode - Inspect
00:00:00
Mode - Personnel
01:00:00
Mode - Rope Up
00:00:00
Mode - Heavy
00:00:00
Mode - Gravity
00:00:00
Mode - Brake Maintenance
00:10:00
Single Skip North Side
03:40:00
Single Skip South Side
03:00:00
Tipple Bin North High
00:40:00
Tipple Bin North Off
00:00:00
Tipple Bin South High
01:00:00
Tipple Bin South Off
00:00:00
Code
Description
Category
Occurrences
Duration
233
Skip Overload
Load
2
00:30:00
134
Medium Voltage Transformer Tripped
Drive
1
00:20:00
170
Drive Communications
Drive
1
00:20:00
212
Loading Pocket Not Ready
Position
1
00:20:00
05/31/2026 | 1st Shift - 11:00 PM to 6:59 AM
Start
End
Skips North
Skips South
Skips Hour
MT North
AVG MT North
MT South
AVG MT South
Total MT
AVG Total MT
Total ST
Hourly Target | 400
23:00
00:00
19
20
39
197
10.39
203
10.20
401
10.29
442
100.3%
00:00
01:00
15
23
38
162
10.83
234
10.20
397
10.45
437
99.3%
01:00
02:00
18
21
39
186
10.38
213
10.19
400
10.28
441
100.0%
02:00
03:00
19
19
38
195
10.28
196
10.32
391
10.30
431
97.8%
03:00
04:00
19
19
38
189
9.97
196
10.35
386
10.16
425
96.5%
04:00
05:00
0
0
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0%
05:00
06:00
14
22
36
145
10.36
226
10.27
371
10.31
409
92.8%
06:00
07:00
0
0
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0%
Totals:
104
124
228
1,076
10.35
1,271
10.25
2,347
10.30
2,588
73.3%
06/01/2026 | 2nd Shift - 7:00 AM to 2:59 PM
Start
End
Skips North
Skips South
Skips Hour
MT North
AVG MT North
MT South
AVG MT South
Total MT
AVG Total MT
Total ST
Hourly Target | 400
07:00
08:00
17
21
38
179
10.54
214
10.22
393
10.36
434
98.3%
08:00
09:00
18
21
39
177
9.85
208
9.95
386
9.90
425
96.5%
09:00
10:00
17
18
35
172
10.16
184
10.26
357
10.21
393
89.3%
10:00
11:00
23
15
38
239
10.42
154
10.29
394
10.37
434
98.5%
11:00
12:00
0
0
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0%
12:00
13:00
18
21
39
189
10.55
210
10.02
400
10.27
441
100.0%
13:00
14:00
19
21
40
190
10.00
215
10.26
405
10.14
447
101.3%
14:00
15:00
21
15
36
221
10.55
149
10.00
371
10.32
409
92.8%
Totals:
133
132
265
1,370
10.31
1,338
10.14
2,709
10.22
2,986
84.7%
06/01/2026 | 3rd Shift - 3:00 PM to 10:59 PM
Start
End
Skips North
Skips South
Skips Hour
MT North
AVG MT North
MT South
AVG MT South
Total MT
AVG Total MT
Total ST
Hourly Target | 400
15:00
16:00
10
15
25
107
10.77
153
10.25
261
10.46
288
65.3%
16:00
17:00
0
0
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0%
17:00
18:00
0
0
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0%
18:00
19:00
0
0
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0%
19:00
20:00
0
0
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0%
20:00
21:00
0
0
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0%
21:00
22:00
0
0
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0%
22:00
23:00
0
0
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0%
Totals:
10
15
25
107
10.77
153
10.25
261
10.46
288
8.2%
1st Shift - MIDS
2,587 ST
2nd Shift - DAYS
2,986 ST
Daily Production Progress
5,862 ST
Target: 7,000.00 ST
On track - good progress
Code
Mode
Description
Category
Timestamp
Duration
Loading faults by occurrence...
Shift Summary
The shift produced 5318.38 tons across 518 skips, falling short of the 7000-ton daily target by 1681.62 tons (76% of goal). The team experienced 4 fault events (1 Load, 2 Drive, 1 Position) totaling 90 minutes of downtime and 2 E-stop events totaling 0 minutes.
Operational Impact
Produced 1681.62 tons below daily goal (24% shortfall), putting monthly target at risk
90 minutes of fault-related downtime reduced potential output by approximately 144 tons
Year-to-date production at 10% of annual target - sustained improvement needed to meet yearly goals
Priority Focus
Production significantly below target - conduct shift debrief to identify systemic issues
Actual
2,347 tons
Pace
391.2 tons/hr
Projected
3,129 tons
Target
3,760 tons
Actual
2,709 tons
Pace
387.0 tons/hr
Projected
3,096 tons
Target
3,760 tons
Actual
261 tons
Pace
261.0 tons/hr
Projected
2,088 tons
Target
3,760 tons
The result
Your mine, right now.
5,863
short tons today, live — and your team knows if they're ahead or behind before the shift ends.
Enter the live report